CAP Incentive Projects

The Sac Metro Air District is funding projects that provide timely emission reductions, decrease public exposure to air pollution, and have community support. Funding priority is given to projects that impact the South Sacramento Florin Air Monitoring Community, the other nine Sacramento communities identified through the Community Air Protection process, disadvantaged communities (DAC), and low-income communities (LIC) identified by CalEnviroScreen 4.0 and AB1550.

Map showing the locations of the 10 identified communities in Sacramento County.  


The District also administered projects on behalf of the Yolo-Solano Air Quality Management District (YSAQMD) for CAP Years 1 through 3. Funding priority for YSAQMD projects will go to areas identified as disadvantaged communities or low-income areas identified by CalEnviroScreen 3.0 and AB1550.


Current Eligible Equipment and Project Types

To apply for funding visit the following pages for more information on equipment-specific funding opportunities:

New Project Categories in Development:

  • Stationary Source:  New general project category developed by the California Air Resources Board
  • Air Filtration in Schools: program under development by Sac Metro Air District
  • Lawn and Garden:  program development is currently on hold

CAP Year 1 (FY 17/18) Projects

​Company Name ​CAP Incentive Funding Amount ​Project Type ​Project Description ​Identified Community or Area ​Project Status
A-Z Bus Sales, Inc.​ ​$52,620 ​Electric Charging Station ​9 chargers and infrastructure to support electric school and shuttle buses ​South Sacramento Florin Air Monitoring Community, DAC ​Completed
​Bottling Group, LLC* ​$197,576.60 ​Electric Charging Station ​4 chargers and infrastructure to support electric semi truck fleet (funding split between Years 1 and 2)  South Sacramento Florin Air Monitoring Community, DAC Completed​
California Department of Transportation - Capital Corridor​ (​$132,432) ​Locomotive 2 Tier 4 Locomotives, Joint project with BAAQMD.  ​Downtown Sacramento, Yolo-Solano AQMD, Bay Area AQMD, DAC ​Project in Process
​Community Housing Opportunities Corporation ​$17,096.50 ​Electric Charging Station ​Electric charging stations to support Our Community CarShare at Washington Square ​Downtown Sacramento, DAC ​Completed
​Crown Corporate Center Owner's Association $40,000​ ​Electric Charging Station 2 chargers and infrastructure ​Metro Center, Sacramento, DAC ​Completed
​Green Technical Education and Employment ​$336,411 ​Electric Charging Station ​4 chargers and infrastructure to support the Del Paso Heights DAC mobility HUB ​Norwood/Old North Sacramento, DAC Completed
​Habitat for Humanity of Greater Sacramento $59,980​ ​Electric Charging Station 2 chargers and infrastructure​ ​Richards, Sacramento, DAC ​Completed
McClellan Park Transportation Management Assoc.​ ​$96,040 ​Electric Charging Station ​4 dual chargers at 4 locations ​McClellan, DAC Completed
Mutual Housing California​ $18,015 ​Electric Charging Station ​2 chargers and infrastructure to support Our Community CarShare at On the Greenway location Fruitridge, DAC​ ​Completed
Natomas Unified School District​ ​$0 ​Electric School Buses ​4 Electric School Buses ​South Natomas ​Application withdrawn by applicant
​Sacramento City Unified School District ​$0 ​Electric School Bus ​4-10 Electric School Buses ​South Sacramento/ Florin Air Monitoring Community, Downtown Sacramento, Fruitridge, Meadowview, N. Oak Park/Elmhurst, Upper Land Park ​Application withdrawn by applicant
​San Juan Unified School District ​$0 ​Electric School Buses ​6 Electric school buses ​McClellan, Arden Arcade, DAC Project shifted to Year 2
Southgate Recreation and Park District* $35,769​ ​Lawn and Garden  Electric lawn and garden equipment (funding split between Years 1 and 2) South Sacramento/ Florin Air Monitoring Community ​Completed
Twin Rivers Unified School District​ ​$900,000 ​Electric School Buses ​9 Electric School Buses Norwood/Old North Sacramento, McClellan Completed​
Twin Rivers Unified School District​* $1,077,053.90​ ​Electric Charging Station ​Chargers and infrastructure to support electric school bus fleet (funding split between Years 1, 2, 3, & 5) Norwood/Old North Sacramento, McClellan Project in Process​
​University of California Regents, UCD Med Center ​$0 ​Electric Charging Station ​Electric charging to support changing fleet to electric ​North Oak Park/Elmhurst ​Application withdrawn by applicant
​Vacaville Unified School District ​$100,000 ​Electric School Buses ​2 Electric School Buses (funding split between Years 1 and 2) ​Vacaville (Yolo-Solano Funding) ​Completed
​Washington Unified School District ​$496,000 ​Electric School Buses ​4 Electric School Buses ​West Sacramento (Yolo-Solano Funding) Completed
​Total Allocated: ​$3,426,562
​​ ​​

Updated 08/22/2024

*Project tables are updated regularly. Note that some projects may be co-funded or split-funded.

CAP Year 2 (FY 18/19) Projects

​Company Name ​CAP Incentive Funding Amount Project Type Project Description Identified Community or Area Project Status
​Arcohe Union School District ​$228,643 ​Electric School Bus ​1 electric school bus ​Sacramento County ​Project in Process
​Bottling Group, LLC* ​$572,223.40 ​Electric Charging Infrastructure 4 chargers and infrastructure to support electric semi truck fleet (funding split between Years 1 and 2)  ​South Sacramento/Florin Air Monitoring Community ​​Completed
​Center Joint Unified School District ​$0 ​Electric School Bus 4 electric school buses​ McClellan ​Application Withdrawn by Applicant
​City of Sacramento $1,391,774​ ​Infrastructure CNG infrastructure to support CNG truck fleet​ ​South Sacramento/Florin Air Monitoring Community and DACs Completed​
​Dry Creek Unified School District ​$0 ​Electric School Bus ​1 electric school bus ​Sacramento County ​Project moved to other funding sources
​Dry Creek Unified School District ​$0 ​Electric Charging Infrastructure ​Charging infrastructure to support electric school buses ​Sacramento County ​Project moved to other funding sources
​Elk Grove Unified School District
​$2,326,624
​Electric School Bus
​9 electric school buses
​South Sacramento/Florin Air Monitoring Community
​Completed
Elk Grove Unified School District $1,910,000​ Electric School Bus ​7 electric school buses ​South Sacramento/Florin Air Monitoring Community ​Completed
​Eskaton - Jefferson Manor ​$41,390 ​Electric Charging Infrastructure ​Electric charging to support Our Community Car ​South Sacramento/Florin Air Monitoring Community ​Completed
​Folsom Cordova Unified School District ​$770,000 ​Electric School Bus ​2 electric school buses ​Sacramento County ​Project in Process
Galt Joint Union Elementary School District​ ​$230,000 ​Electric School Bus ​1 electric school bus ​Sacramento County Completed
​Galt Joint Union High School District ​$230,000 ​Electric School Bus 1 electric school bus​ ​Sacramento County ​Completed
​Natomas Unified School District $180,000​ ​Electric School Bus 1 electric school bus​ Sacramento County​ Completed​
​New Bern Transport Corporation (PepsiCo) ​$1,475,391 ​Electric Freight Trucks 17 electric freight trucks ​South Sacramento/Florin Air Monitoring Community Completed
River Delta Unified School District ​$0 ​Electric School Bus 1 electric school bus Sacramento County, Yolo-Solano  AQMD ​Project moved to other funding sources
Robla Elementary School District ​$800,000 ​Electric School Bus 5 electric school buses ​Norwood/Old North Sacramento, McClellan Project in Process
​Sacramento City Unified School District ​$0 ​Electric School Bus 1 electric school bus​ ​South Sacramento/Florin Air Monitoring Community, Downtown Sacramento, Fruitridge, Meadowview, N. Oak Park/Elmhurst,  Upper Land Park ​Application Withdrawn by Applicant
Sacramento Housing and Redevelopment Agency​ ​$0 ​Electric Charging Infrastructure ​Electric charging to support Our Community Car Share ​Upper Land Park ​Project shifted to Year 3
​Sacramento Public Library Authority ​$0 ​Electric Charging Infrastructure ​Electric charging to support an electric bookmobile funded by our SECAT program Downtown Sacramento ​Project shifted to Year 3
Sacramento Regional Transit ​$0 ​Electric Charging Infrastructure ​Electric charging infrastructure to support Sac RT fleet transition to electric ​Sacramento County ​Project Withdrawn
​Sacramento Tree Foundation ​$11,793 Electric Charging Infrastructure ​Electric charging station to support two electric box trucks ​Sacramento County, DAC Completed​
​San Juan Unified School District ​$1,284,774 Electric School Bus 6 electric school buses ​McClellan, Arden Arcade ​Project in Process
​San Juan Unified School District ​$0 ​Electric Charging Infrastructure ​Electric charging stations to support electric school buses ​McClellan, Ardent Arcade ​Project shifted to Year 5
​Southgate Recreation & Park District* ​$800 ​Lawn and Garden Electric lawn and garden equipment (funding split between Years 1 and 2) South Sacramento/ Florin Air Monitoring Community ​Completed
​Southgate Recreation & Park District ​$683,802 Electric Charging Infrastructure​ Electric charging stations with solar components at multiple locations​ ​South Sacramento, DAC Project in Process​
​Twin Rivers Unified School District $2,361,425.51
​Electric School Bus 22 electric school buses​ Norwood/Old North Sacramento, McClellan ​Completed
​Twin Rivers Unified School District* ​$44,141.49 Electric Charging Infrastructure Chargers and infrastructure to support electric school bus fleet (funding split between Years 1, 2, 3, & 5) Norwood/Old North Sacramento, McClellan ​Project in Process
​Twin Rivers Unified School District* $202,900​ Electric School Bus​ ​10 electric school buses (funding split between Years 2 and 3) Norwood/Old North Sacramento, McClellan​ ​Project in Process
​Vacaville Unified School District $200,000​
Electric School Bus​
​2 Electric School Buses (funding split between Years 1 and 2) ​Vacaville (Yolo-Solano Funding) ​Completed
​Total Allocated: $14,945,711.40



Updated 08/22/2024
*Project tables are updated regularly. Note that some projects may be co-funded or split-funded. 

CAP Year 3 (FY 19/20) Projects

​Company Name ​CAP Incentive Funding Amount ​Project Type ​Project Description ​Identified Community or Area ​Project Status
Arcohe Union School District ​$0 ​Electric School Buses ​1 Electric School Bus Herald Insufficient Funding
​Arden Acres, Inc. ​$107,500 ​Electric Charging Station Installation of Two (2) DC Fast Charging Stations and Five (5) Level 2 Charging Stations ​Old North Sacramento, DAC Project in Process
Center Joint Unified School District ​$0 Electric School Buses 4 Electric School Buses Antelope Insufficient Funding
Center Joint Unified School District ​$0 ​Electric Charging Stations 3 EV Charging Stations to support Electric School Buses ​Antelope Insufficient Funding
​City of Sacramento* ​$49,700 Electric Charging Stations​ Public EV Charging Stations at Multiple Locations (funding split between Years 3 and 6)​ Sacramento, DAC​ Project in Process​
​City of Sacramento* ​$250,915 Electric Charging Stations​ Public EV Charging Stations at Multiple Locations (funding split between Years 3 and 6)​ Sacramento, DAC​ ​Project in Process
​County of Sacramento - General Services* $127,356​ ​Electric Charging Stations Installation of Twelve (​12) Dual-Port, Level 2 Charging Stations (funding split between Years 3 and 5) ​Richards, Sacramento, DAC ​Project in Process
Elk Grove Unified School District $0
​Electric School Bus 9 Electric School Buses ​South Sacramento/Florin Air Monitoring Community Project Shifted to Year 2​
Elk Grove Unified School District ​$0
​Electric School Bus 7 Electric School Buses ​South Sacramento/Florin Air Monitoring Community Project Shifted to Year 2​
Galt Joint Union Elementary School District ​$0 ​Electric School Bus 5 Electric School Buses Galt  Insufficient Funding
​Galt Joint Union High School District ​$0 ​Electric School Bus ​5 Electric School Buses Galt Insufficient Funding
Mather Point LLC​ ​$187,500 Electric Charging Station​ Installation of Four (4) DC Fast Charging Stations and Five (5) Level 2 Charging Stations ​Rancho Cordova, DAC ​Project in Process
Natomas Unified School District $0 ​Electric School Bus 1 Electric School Bus Natomas, LIC​ ​Project Shifted to Year 2
PHE, Inc ​$0 ​Electric Charging Stations ​2 EV Charging Stations and Infrastructure South Sacramento/ Florin Air Monitoring Community ​Application Withdrawn by Applicant
​Sacramento Housing and Redevelopment Agency $59,300​ Electric Charging Stations​ 3 EV Charging Stations and Infrastructure ​ ​Dos Rios Triangle, DAC, and LIC ​Project in Process
​Sacramento Public Library Authority $470,000 ​Electric Charging Stations 4 EV Charging Stations and Infrastructure to Support Mobility Hub Project South Sacramento/ Florin Air Monitoring Community Project in Process
Southgate Recreation and Park District $0 Lawn and Garden 25 pieces of Electric Lawn and Garden Equipment South Sacramento/ Florin Air Monitoring Community Project Shifted to Years 1 and 2
Southgate Recreation and Park District
$0 Electric Charging Stations 4 EV Charging Stations and Infrastructure including Solar Panels South Sacramento/ Florin Air Monitoring Community Project Shifted to Year 2
​Takhar South Sac Petroleum, LLC $187,500​ Electric Charging Stations​ Installation of Four (4) DC Fast Charging Stations​ South Sacramento, DAC​ ​Project in Process
Twin Rivers Unified School District* $26,592.22 Electric Charging Stations Chargers and Infrastructure to Support Electric School Bus Fleet (funding split between Years 1, 2, 3, & 5) Norwood/Old North Sacramento, McClellan Project in Process
Twin Rivers Unified School District* $1,709,500​ Electric School Buses​ ​10 Electric School Buses (funding split between Years 2 and 3)
Norwood/Old North Sacramento, McClellan ​Project in Process
Twin Rivers Unified School District ​$1,209,000 Electric School Buses​ 5 Electric School Buses​ Norwood/Old North Sacramento, McClellan Project in Process​
​Washington Unified School District $640,000 Electric School Buses 2 Electric School Buses ​West Sacramento ​Project in Process
​Total Allocated: ​$5,024,863.22
​​ ​​

Updated 08/22/2024

*Project tables are updated regularly. Note that some projects may be co-funded or split-funded.

CAP Year 4/5 (FY 21/22) Projects

​Company Name ​CAP Incentive Proposed Funding Project
Type
​Project Description Project Location ​Project Status
Allied Waste Services of North America, LLC
​$812,896 On-Road Five (5) EV Refuse Truck Replacements 3326 Fitzgerald Rd, Rancho Cordova Project in Process
Allied Waste Services of North America, LLC $392,000​ ​Infrastructure Installation of Three (3) DC Fast Charging Stations 8642 Elder Creek Rd, Sacramento Project in Process​
​Apro, LLC $161,448​ ​Infrastructure Installation of One (1) DC Fast Charging Station ​6500 Mack Rd, Sacramento ​Project in Process
Apro, LLC ​$0 Infrastructure​ Installation of One (1) DC Fast Charging Station​ 4705 Florin Rd, Sacramento​ Project Shifted to Year 6​
Arden Acres, Inc.  ​$0 ​Infrastructure Installation of Two (2) DC Fast Charging Stations and Five (5) Level 2 Charging Stations 2421 Clay St, Sacramento Project Shifted to Year 3
California Waste Recovery Systems, LLC ​$0 ​On-Road Two (2) EV Heavy-Duty Truck Replacements 175 Enterprise Court, Galt   Moved to Other Funding Sources
​City of Sacramento - Dept. of Youth, Parks & Community Enrichment ​$0 ​Off-Road Four (4) Electric Tractor Replacements​ ​5730 24th St, Sacramento Project Withdrawn
County of Sacramento​ - General Services* ​$351,291
Infrastructure​ Installation of Twelve (​12) Dual-Port, Level 2 Charging Stations (funding split between Years 3 and 5) ​625 7th Street, Sacramento Project in Process
​County of Sacramento - General Services ​$0 ​Infrastructure Installation of One (1) DC Fast Charging Station ​9661 Conservation Rd, Sacramento ​Moved to Other Funding Sources
​County of Sacramento - General Services $0​ Infrastructure​ ​Installation of Five (5) Level 2 Charging Stations ​9611 Conservation Rd, Sacramento Moved to Other Funding Sources​
​County of Sacramento - General Services $0​ Infrastructure​ Installation of  One (1) DC Fast Charging Station and Thirteen (13) Level 2 Charging Stations ​3701 Branch Center Road Moved to Other Funding Sources​
​County of Sacramento - Waste Management $2,012,103​ ​On-Road Twenty-eight (28) CNG and EV Heavy-Duty Truck Replacements​ 4450 N. Roseville Rd, Sacramento​ Project in Process​
​Elk Grove Unified School District
​$0
Electric School Bus​ 9 Electric School Buses 8421 Gerber Rd, Sacramento​ ​Project Shifted to Year 2
Green Technical Education and Employment TBD Infrastructure Solar-Powered Infrastructure for Electric Bike Mobility Hub 3741 May St, Sacramento Under Review
Mather Point, LLC​ ​$0 ​Infrastructure Installation of Four (4) DC Fast Charging Stations and Five (5) Level 2 Charging Stations​ ​3581 Mather Field Rd, Rancho Cordova Project Shifted to Year 3
​MMC Transportation ​$0 ​On-Road Two (2) CNG HD Truck Replacements​ 1710 Main Ave, Sacramento​ Project Withdrawn
​Riverfront Plaza HOA ​$54,939 Infrastructure​ Installation of Five (5) Level 2 Charging Stations​ ​200 P St, Sacramento ​Project in Process
​San Juan Unified School District ​$1,500,000 On-Road​ Fifteen (15) Alternative Fuel Bus Replacements​ 3050 Orange Grove Ave, North Highlands​ ​Under Review
​San Juan Unified School District ​$350,335 ​Infrastructure ​Fueling Infrastructure to Support School Bus Fleet 3050 Orange Grove Ave, North Highlands​ Under Review​
​Stockton Plaza Partners, LLC $0​ Infrastructure​ Installation of Four (4) DC Fast Charging Stations and Five (5) Level 2 Charging Stations ​5060 Stockton Blvd, Sacramento Moved to Other Funding Sources​
​Takhar South Sac Petroleum, LLC $​0 Infrastructure​ Installation of Four (4) DC Fast Charging Stations​ 5625 Florin Rd, Sacramento​ Project shifted to Year 3​
Twin Rivers Unified School District* $288,472.39​ Infrastructure​ Chargers and Infrastructure to Support Electric School Bus Fleet (funding split between Years 1, 2, 3, & 5) 1400-B Grand Ave, Sacramento​ Project in Process​
​Total Allocated: ​$5,923,484.39
​​
​​

Updated 08/22​/2024

*Project tables are updated regularly. Note that some projects may be co-funded or split-funded.

CAP Year 6 (FY 22/23) Projects

​Company Name ​CAP Incentive Proposed Funding Project
Type
​Project Description Project Location ​Project Status
​​Apro, LLC ​$165,252 Infrastructure​ Installation of One (1) DC Fast Charging Station​​ 4705 Florin Rd, Sacramento​​ Project in Process
City of Sacramento* ​$254,115 ​Infrastructure Public EV Charging Stations at Multiple Locations (funding split between Years 3 and 6)​ 5600 S Land Park Dr

4799 Stockton Blvd

2450 Meadowview Rd
Project in Process
​City of Sacramento*​$633,735Infrastructure​Public EV Charging Stations at Multiple Locations (funding split between Years 3 and 6)​​920 Grand Ave

 6207 Logan St

3271 Marysville Blvd

7340 24th St Bypass

3425 Martin Luther King Jr Blvd

2921 Truxel Rd

7400 Imagination Pkwy

2601 New Market Dr

7654 Pocket Rd

3501 59th St
Project in Process​
Folsom Cordova Unified School District ​$2,600,000 ​Electric School Bus Twelve (12) Electric School Buses 11458 Elks Circle, Rancho Cordova
Under Review
​Sacramento City Unified School District$2,221,639​Electric School Bus​Seven​ (7) Electric School Buses​7050 San Joaquin Street, Sacramento​Under Review​
​Total Allocated: ​$5,874,741.00
​​ ​​

Updated 08/22/2024

*Project tables are updated regularly. Note that some projects may be co-funded or split-funded.

Fiscal Year 23/24 Projects

All fiscal year 23/24 projects are listed on the current Funding Awards page.

Supporting Page